In an effort to promote eco-responsibility and explore solutions for producing green electricity, the city of Vienne has decided to install a micro-hydroelectric power plant in the Gère River (38). The electricity generated by the river's strong flow will eventually allow the entire city to be illuminated.

The project's inception began in 2014, but it wasn't until 2023 that the work could actually start. The development of this section of the Gère River was delayed several times, which explains the late commencement of the construction. After extensive studies conducted to avoid disrupting the fish passage in this river and to preserve the lives of the residents of Vienne, the first stages of the project could only begin in 2023.

This large-scale project starts with the installation of an initial power plant, followed by a second one in the near future, which will produce 780 MWh/year. This will allow the city to achieve significant savings on electricity consumption while also reducing greenhouse gas emissions.

The challenge faced by our client:

In order to enable the construction of the micro-turbine support and its installation, the work could not begin until the section of the river concerned was diverted from its usual flow.

The challenge faced by our client was therefore significant: to divert the course of the river to create dry foundations without compromising the water flow, thereby preserving the passage of fish. A fish passage is already in place to ensure that the existing thresholds (waterfalls) do not hinder the upstream or downstream movement along the river, but it does not divert the river's course.

The solution provided by Containers Service:

Our sales team proposed the installation of Big Bags filled with crushed aggregate to form a barrier and limit the flow of water in the entire area designated for the construction of the micro-hydroelectric plant.

The Big Bags offered by Containers Service measure 87x87x80 cm and are made with a full-open top and a flat bottom. The 240g/m² fabric can support up to 2000 kg per Big Bag.

This stacking of more than 300 Big Bags, held together by their own weight, will divert the river's flow and allow the necessary work to be carried out.

The implementation of this solution was a collaborative effort with a civil engineering company, responsible for providing the materials to fill the Big Bags and their installation on site. The involvement of underwater divers also allowed us to divert the river in record time for the placement of the Big Bags in the water.

Containers Service has been selling Big Bags for many years. These large, flexible bulk containers are used for storing and transporting solid materials such as sand, rubble, powders, etc. Typically with a volume of 1m³, they allow for the storage of a significant amount of material and can be easily and safely moved using specialized equipment.

Final Client Feedback:

Thanks to Containers Service’s Big Bags, we were able to quickly and affordably divert the Gère River’s flow to facilitate the installation of a micro-hydroelectric power plant.

This solution proved to be simple, fast, and less expensive compared to the installation of sheet piles (generally metal profiles driven into the ground for the construction of various permanent structures, such as dike reinforcement, dams, quays, locks, bank protection, retaining walls, cutoff walls to prevent water flow, etc.).

The dam, created by stacking the Big Bags, was then covered with an agricultural tarp to enhance the installation’s waterproofing.

The construction site is now dry, and we have six months to complete the installation of the hydraulic turbine and an extension of the existing fish pass.

In the future, once the micro-hydroelectric turbine is installed, we will replace this Big Bag dam with riprap.